Engineering case
It has mechanical installation and processing equipment, special hydraulic lifting equipment, forklift truck and special large equipment relocation tools, special cleaning equipment, etc.
keyword:
Categories:
Case
Electromechanical equipment
Installation of pipeline equipment
Large scale mechanical equipment
Equipment and energy supporting installation
Engineering case
Completed the Volkswagen Engine (Dalian) Co., LTD. EA888, Production and installation of 1000 transformation equipment supporting medium pipelines, EA888 upgrading and expansion power as of the production and installation of pipelines, EA888 Upgrade the workshop equipment power supply and medium pipeline secondary supporting connection project is under construction, Production and installation of connecting rod equipment in phase I workshop, Completed the replacement of the overall external wall board of the workshop; Completed the Volkswagen transmission phase II part of the equipment lifting, loading and unloading truck, handling and positioning project, Production and installation of supporting oil pipelines, oil storage tanks, water storage tanks and heat treatment detection probe wiring engineering, Production and installation of emulsion pipeline for the second phase cleaning machine equipment, Installation works of oil pipeline in AVS workshop, DQ200 Renovation and installation project of workshop exhaust system, Secondary distribution works of Phase 5, Supporting Donaldson, Abson completed Tianjin Volkswagen transmission oil fog and dust purifier transformation and other major projects. Cooperate with German Fordy to install oil filter and pipeline for VINFAST, the first automobile manufacturer in Vietnam, and help Grey go abroad.
previous page
next page
previous page
Engineering case
next page
Related products
MSSAGES