Company Profile


Dalian Gerui mechanical and electrical equipment installation and maintenance Co., Ltd., established in 2005, is a professional company specializing in the installation of mechanical and electrical equipment, large-scale mechanical equipment, pipeline equipment and equipment and energy supporting installation. The company has a registered capital of 10 million yuan and 55 regular employees, including 15 engineering and technical personnel. The company's production plant area is 1200 square meters and the office area is 215 square meters. The company has 45 sets of mechanical processing equipment, special hydraulic lift truck, forklift and special large equipment removal tools, special cleaning equipment, etc., with fixed assets of more than 8 million yuan.

Since its establishment, the company has successively completed Al, LM, DMG, GL, TM, ll, 211 of ThyssenKrupp engine systems (Dalian) Co., Ltd Installation of equipment, installation of circulating water and compressed gas pipeline, cleaning and passivation treatment, installation of Siemens enclosed bus bar, installation of Huapeng bus bar, supporting installation of electrical system, fabrication and installation of steel structure and other major projects; completed the power and mechanical and electrical installation project and workshop for phase I plant of ThyssenKrupp engine system (Changzhou) Co., Ltd Installation of Al, GL, Tl, tal, Sal, LPG, AAL and other equipment, installation of circulating water and compressed gas pipeline, installation of Huapeng closed busbar, supporting installation of electrical system, fabrication and installation of steel structure and other major projects; phase II auxiliary power and electromechanical installation project of ThyssenKrupp engine system (Changzhou) Co., Ltd. is under construction: the Volkswagen engine EA888 has been completed, 1000 sets of transformation equipment supporting medium pipeline production and installation engineering, EA888 upgrading and expansion power up to pipeline production and installation, EA888 The secondary matching connection project of power supply and medium pipeline of equipment in the upgrading and transformation workshop is under construction. The production and installation of auxiliary pipeline for connecting rod line equipment in phase I workshop has been completed, including hoisting and unloading of some equipment of Volkswagen transmission phase II, transportation and installation of supporting oil pipeline of phase I and phase II heat treatment equipment, oil storage tank, water storage tank and wiring of heat treatment detection probe We have completed the production and installation of emulsion pipelines for all cleaning machines in phase II, and completed the installation of oil pipelines in AVS workshop, and completed DQ200 The renovation and installation project of workshop exhaust system has completed the relocation and installation of large injection molding machine and press machine of Haier refrigerator in Dalian of Haier Group, the installation of water and electrical equipment supporting adsorption machine, and the production and installation of belt conveying equipment, and the completion of Sima elevator (SIMA) in Korea OTIS) numerical control plate cutting machine tool, folding machine tool installation project; completed the steel structure fabrication and installation project of sandongdoushan metal products sandblasting workshop in South Korea; completed the steel structure fabrication and installation of Xiongchuan ship machinery mobile painting workshop; completed the installation of 10 sets of STX sand treatment systems.

For more than ten years, the company has always adhered to the business philosophy of "integrity and harmony, the pursuit of excellence", with the enterprise purpose of "creating wealth for the society and providing high-quality products for customers". It has been serving Chinese and foreign enterprises with excellence and won the recognition of the society and the trust of customers.

Ms. Zhang Yunsheng, the general manager of the company, together with all the staff, is willing to work with you to develop and create the future together!

 

Dalian GeruiElectromechanical Equipment Installation and Maintenance Co., Ltd

©2022 Dalian Gerui mechanical

SEO | Powered by : www.300.cn Dalian

图片名称

CONTACT INFORMATION


Add

Add:10-10-3, phase II, huashengda Industrial Park, northeast Qijie, Dalian Development Zone